Rock hardness——————————————f=6~20
Impact wind pressure————————1.05-2.4Mpa
Air consumption—————————————10~20m³
Drilling diameter——————————90~165mm
Maximum drilling depth(vertical)——60m
Maximum drilling depth(level)————50m
Highest level drilling height————3500mm
Upill angle——————————————————30°
Moving speed————————————2km/h,3km/h
Output torque of walking motor10500×2N.m
Maximum rotary torqe————————4500N.m
Rotary speed————————————0–80(76)rpm
Propulsion speed—————————0.59m/s(可调)
Single stroke——————————————4m
Maximum lifting force——————————2.2T
Carriage travel——————————————4.3m
Propulsion compensation——————————1.2m
Swing angle of carriage—————左50°右35°
Elevation angle of carriage———————160°
Arm swing angle—————————左45°右45°
Arm pitch angle—————————上60°下19°
Vehicle floating———————————————15°
Weight—————————————————————7T
Dimensions——————7200×2250×2300mm
Transport/storage width———————2250mm
Engine——Yuchai 85KW turbocharged